GOTAFE Campus Transformation

Project Showcase: GOTAFE Campus Transformation

Contractor: Gehring Outdoor Construction

Project Type: Commercial Landscaping & Civil Works

The Objective

To revitalize the campus outdoor areas by creating a modern, durable, and low-maintenance landscape that provides students and staff with a functional space for both learning and leisure.

Our Scope of Work

  • Precision Excavation: Managed site preparation and grading to ensure optimal drainage and structural integrity for all new installations.

  • Hardscaping & Structural Support: Installed high-strength retaining walls and paved walkways designed to handle high foot traffic while maintaining a clean, professional aesthetic.

  • Green Space Development: Implemented strategic planting and soil management to soften the architectural lines of the campus and provide year-round greenery.

  • Safety & Compliance: Ensured all works met strict institutional safety standards, providing a secure environment for the campus community.

The Outcome

A transformed educational environment that balances structural durability with contemporary landscape design, reinforcing GOTAFE’s commitment to providing world-class facilities.

Let's Build Something Together

Anthony Gehring : 0424 944 364

Email : Info@gehringgroup.com.au

Fully Licensed & Accredited Builders
DB-L 44417 / CDB-L 49423

Our Location : Factory 8A/93 Wells Road
Chelsea Heights Victoria 3196

Quick Info

Do I require plans?

Your building plans

Plans for your new home, extension, renovation or repairs must take into account:

Victorian Government Building Regulations so that the work is structurally adequate and the health, safety and amenity standards for building is achieved
foundation data, including soil tests, to work out an appropriate foundation depth, excavation costs and an adequate footing system for the building
local council laws
mandatory energy rating requirements.

Make sure everything you want is in writing and in the plans and specifications before you sign the contract - changes can be expensive once you have signed. Changes may also require an amendment to the building permit.

The Planning Phase

The planning phase is when the project plans are documented, the project deliverables and requirements are defined, and the project schedule is created. It involves creating a set of plans to help guide your team through the implementation and closure phases of the project.

The 5 basic phases in the project management process are:

Project Initiation.
Project Planning.
Project Execution.
Project Monitoring and Controlling.
Project Closing.
Ensure you are Insured

What insurances are compulsory for the building industry?

Everyone who works on your building should have current certificates and insurance.

Home building compensation cover.
Contract works insurance.
Professional indemnity insurance.
Public liability insurance.
Workers compensation insurance.
Other insurance issues for homeowners.
Have Your Plans Drawn

building plan is essentially a graphical representation of what the building you’re constructing will look like once construction has been completed. These plans can help you determine how much a project is going to cost, which is useful when creating an initial budget. Plans are always a good way to get things underway. Its needed for the permit and allows the client to gets several quotes to gauge costings for the upcoming project.Gehring group offers this process.